API
API Spec Q1
- Cert No.
- [VERIFY] Q1-0000
- Issued
- 1 Aug 2023
- [VERIFY] Scope item 1
- [VERIFY] Scope item 2
Certificate PDF pending upload.
Trust layer
Numbers, dates, scope lists and PDFs. If your auditor asks, they should not need to email us.
Certifications
Each card lists the certificate number, issuing body, and scope.
API
Certificate PDF pending upload.
API
Certificate PDF pending upload.
External QMS auditor
Certificate PDF pending upload.
EGAC
Certificate PDF pending upload.
Scope expansion
Active accreditation extensions and audits in progress.
Widening ISO 17025 scope to cover offshore lifting equipment.
Manufacturing capability audit and Q1 process alignment.
Class-surveyor-recognized on-board testing packages.
Widening HV insulation & earth-continuity testing scope.
Compliance
Which frameworks and scopes each IEPS capability is covered under.
| Capability | ISO 17025 | ISO 9001 | API 6A | API Q1 | EGPC | E-GAS | Marine class |
|---|---|---|---|---|---|---|---|
| Calibration & measurement | |||||||
| Pressure testing | |||||||
| Inspection & certification | |||||||
| Manufactured components | |||||||
| Documentation & COC |
covered · partial · not in scope
Registrations
Beyond accreditation, IEPS is registered with EGPC and E-GAS to operate in Egyptian upstream and midstream — real trust assets that were absent from the design mockups.
Every certification has its own PDF. If something is not on this page yet, ask sales — we will attach the latest revision directly to the reply.